4.9 Google
(888) 405-1742

Need a No Further Remediation Letter? Clean Up Your Property the Voluntary Way.

Illinois Site Remediation Program (SRP) · Investigate, remediate & earn your IEPA NFR letter · Make the property clean, sellable & financeable

Investigation · Remediation · No Further Remediation Letter
Illinois EPA SRP Voluntary & Owner-Funded NFR Letter at Closure
4.9/5 Google
NFR Letter Outcome
5,000+ Reports
Woman-Owned

Get Your SRP / NFR Quote

We'll respond promptly with next steps

Please enter a valid email address

Prefer to talk?

(888) 405-1742
More below
NFR Letters Secured
4.9★ Google
Illinois EPA SRP
Investigate · Remediate · Close

How It Works

1

Investigation

First we find the problem: where the contamination is, what type it is, and at what concentrations — in soil, groundwater, or both. This defines the extent of the release and sets up an IEPA-approved path to closure. Much of this data can be collected during the Phase 2 ESA to save time and cost.

2

Remediation

Next we execute an Illinois EPA–approved remedial plan — which may mean digging and hauling contaminated soil to a landfill, capping with an impervious material, or installing engineered barriers. Where active cleanup isn't warranted, institutional controls can meet the objectives instead.

3

No Further Remediation Letter

Finally the IEPA issues your No Further Remediation (NFR) letter — confirming the property's cleanup objectives are met and that conditions don't present a significant risk. The NFR ends the SRP process and signals to buyers and lenders that the property is clean.

Soil and groundwater sampling during a Site Remediation Program investigation — drilling rig and sample collection

Where the SRP Fits

The Site Remediation Program follows the investigation a Phase 2 ESA starts, carrying a property all the way to a No Further Remediation letter. Alongside it, the LUST program is Illinois' other main cleanup path — SRP for voluntary, broad-contamination cleanups and LUST for petroleum releases from registered underground tanks.

Phase 2 ESA
The subsurface sampling that comes first — it confirms the contamination an SRP then remediates and closes.
Before
Defines the problem the SRP solves.
  • Standard: ASTM E1903-19
  • Method: Soil borings, groundwater, lab analysis
  • Finds: Whether contamination is present, and how much
  • Best for: Confirming a REC before cleanup
Learn About Phase 2 ESA
You are here
Site Remediation Program
Illinois' voluntary, owner-funded path to a No Further Remediation letter for a broad range of contamination.
~$20k
Ballpark total — scales with site complexity.
  • Program: Illinois EPA SRP (voluntary)
  • Phases: Investigation, remediation, NFR letter
  • Covers: A broad range of regulated contaminants
  • Outcome: NFR letter — clean, sellable property
Get a Quote
Leaking UST (LUST)
Illinois' other main cleanup program — for petroleum releases from registered underground storage tanks.
Petroleum
Has its own program & Fund.
  • Program: Leaking Underground Storage Tank
  • Covers: Petroleum from registered USTs
  • Funding: Dedicated state LUST Fund
  • Best for: Tank-related petroleum releases
Learn About UST/LUST
Former dry cleaner storefront — a chlorinated-solvent source often addressed through the Site Remediation Program

What Our Clients Say

Industrial facility undergoing voluntary cleanup toward a No Further Remediation letter

Credentials That Matter

IEPA SRP Experience

NFR letters secured

Woman-Owned

Small business (WOSB)

10+ Years

Environmental consulting

4.9 / 5 Stars

Google Reviews

Drums and storage barrels at an industrial property — a contamination source the Site Remediation Program can address

Understanding the Illinois Site Remediation Program

The Site Remediation Program (SRP) is an Illinois EPA program through which a landowner can voluntarily investigate and, where warranted, remediate their property to earn a No Further Remediation (NFR) letter. The IEPA issues that letter to Remediation Applicants who demonstrate — through investigation and, when necessary, remedial action — that conditions on the property do not present a significant risk to human health or the environment. It runs in three phases: investigation, remediation, and the NFR letter that closes the case. A3 Environmental serves Illinois property owners and works throughout the Midwest.

The Three Phases: Investigation, Remediation, NFR

The SRP follows a clear sequence. Investigation comes first — finding where the contamination is, what type it is, and at what concentrations, in soil, groundwater, or both. Remediation follows, executing an IEPA-approved plan: digging and hauling contaminated soil to a landfill, capping with an impervious material, installing engineered barriers, or another approved method. Finally the NFR letter — the IEPA's confirmation that cleanup objectives are met — ends the SRP process.

SRP vs. LUST: Illinois' Two Main Cleanup Programs

Illinois runs two principal cleanup programs, and the distinction is simply about the source of the contamination. The SRP is voluntary and owner-funded — the owner pays for the cleanup, no state budget covers it — and it covers a broad range of contamination. The LUST program (Leaking Underground Storage Tank) is for petroleum releases from registered underground storage tanks and has its own program and dedicated Fund. A3 Environmental performs both kinds of work; if your site involves a registered petroleum tank, the LUST program may be the right fit, and you can learn about UST/LUST cleanups here. In states outside Illinois, the SRP's voluntary analog is called a Voluntary Action Program (VAP) or Voluntary Cleanup Program (VCP).

Why Pursue an NFR Letter

Without an NFR letter, some properties are effectively un-financeable or treated as blighted — a lender or buyer has no assurance the site was cleaned to state standards. The NFR letter is that assurance: it signals that the property was investigated and remediated to IEPA standards, in plain terms that the property is clean. That protection is what keeps a sale or a financing deal alive, which is why owners pursue the SRP even when participation is voluntary.

What It Costs and How Long It Takes

The IEPA charges an application fee plus hourly review and project-management time — commonly from about $2,500 to over $20,000 of state cost depending on complexity. Environmental consultants also bill hourly, and investigation and laboratory costs scale with the size of the contaminant plume and the site geology. A common ballpark total lands around $20,000. The SRP budget is stand-alone: a Phase 1 ESA (about $2,000) and a Phase 2 ESA (about $4,000 to $11,000) typically precede it. On timeline, the fastest realistic completion is roughly 6 months, a typical project takes a little over a year to reach the NFR, and complex sites can take longer. The two biggest factors are case complexity and the assigned IEPA caseworker's experience and workload — understaffing can slow a case down.

Comprehensive vs. Focused NFR

There are two forms of NFR. A Comprehensive NFR covers all regulated contaminants — the fuller form of relief, closer to a clean bill of health for the property. A Focused NFR covers only specific contamination; it lowers laboratory cost but does not remove all liability, because contaminants outside the focused scope are not addressed. Which one fits depends on your goals for the property and your tolerance for residual liability.

Remediation Methods and Institutional Controls

Active cleanup is not always the most cost-effective route. Beyond digging and hauling or capping, the SRP allows engineered barriers — a parking lot, clean-soil cover, grout wall, or a building placed over the contamination — to break the exposure pathway. Institutional and land-use controls can also meet objectives: a Highway Authority Agreement, deed restrictions weighed against TACO (Tiered Approach to Corrective Action Objectives) cleanup levels, and groundwater use restrictions such as a municipal groundwater ordinance. The best way to keep costs down is to hire an experienced consultant who knows the IEPA caseworkers and their expectations — and who can collect SRP data during the Phase 2 ESA. A3 Environmental brings that experience, backed by a 4.9★ Google rating since 2015.

Former gasoline service station — a contaminated property that may pursue cleanup and a No Further Remediation letter

Frequently Asked Questions

The Site Remediation Program (SRP) is an Illinois EPA program in which a landowner voluntarily investigates and, where warranted, remediates their property to earn a No Further Remediation (NFR) letter. It runs in three phases: investigation to find where the contamination is and at what concentrations in soil and groundwater, remediation under an IEPA-approved plan, and the NFR letter that confirms conditions do not present a significant risk to human health or the environment. SRP is voluntary and owner-funded. In other states the equivalent is called a Voluntary Action Program (VAP) or Voluntary Cleanup Program (VCP).
An NFR letter is the document the Illinois EPA issues at the end of the SRP confirming that a property's cleanup objectives have been met and that conditions do not present a significant risk to human health or the environment. In practice it signals that the property was investigated and remediated to IEPA standards — essentially, that the property is clean. The NFR ends the SRP process and is what protects a sale or financing, because without one some properties are considered un-financeable or blighted.
SRP and LUST are Illinois' two main cleanup programs. The SRP is voluntary and owner-funded — the owner pays for the cleanup — and it covers a broad range of contamination. The LUST (Leaking Underground Storage Tank) program is for petroleum releases from registered underground storage tanks and has its own program and Fund. A3 Environmental works in both; which program fits depends on the source of the contamination and whether a registered tank is involved.
The fastest realistic completion is about 6 months, while a typical project takes a little over a year to reach the NFR letter. Complex sites can take considerably longer. The two biggest factors are case complexity and the assigned IEPA caseworker's experience and workload — understaffing can slow a case down. An experienced consultant who knows the IEPA caseworkers and expectations helps keep the project moving.
The IEPA charges an application fee plus hourly review and project-management time, which commonly runs from about $2,500 to over $20,000 of state cost depending on complexity. On top of that, the environmental consultant bills hourly, and investigation and laboratory costs scale with the size of the contaminant plume and site geology. A common ballpark total is around $20,000. The SRP budget is stand-alone — a Phase 1 ESA (about $2,000) and a Phase 2 ESA (about $4,000 to $11,000) typically come before it.
A Comprehensive NFR covers all regulated contaminants — the fuller form of relief, closer to a clean bill of health for the property. A Focused NFR covers only specific contamination, which lowers laboratory cost but does not remove all liability, since contaminants outside the focused scope are not addressed. Which one fits depends on your goals for the property and your tolerance for residual liability.
Ask About the SRP & NFR Letters